It just keeps getting better :)

Right!  Now the photos you have all been waiting for (none of you more so that the would-be house occupants).    The process of the frame jigsaw commenced on Monday and continued over the next three days.   The woodworm and Dad would have loved to get involved in this puzzle although I believe that the builder types are quite smart fellows (no felleses yet) (yes, I know that’s not an actual word) and they had the framing company number them all so that we didn’t end up with the scullery wall in the toilet and vice versa.

It is truly amazing to go to work and then come home and find your house is there waiting for you to wander through and feel astounded that this point has finally arrived.   Then B & I did it all again in the dark (with the help of some bright LED torches) on Thursday night at 10:00pm as it was his first look.  I now have a much better track to my ‘outdoor ablution facility’.  I can choose to go along the drive through the big garage door and then out the back garage door, or if it’s a bit wet and muddy, then I do a drunken origami yoga move and duck under the framing in the 3rd bedroom which is closest to my current ‘bedroom’, then up the hall through the kitchen family room and into the garage and out the back garage door.   The dog on the other hand simply walks though all the walls and gives me a look as if to say “Don’t know why you are going such a long way around!” lol.

So without further adieu – here are the frames :

 

Instant House

Instant House

more framing up

Leave a Reply

Your email address will not be published. Required fields are marked *